Porches Formed and ready for pour
I visited the site today and discovered that the porches were being formed and prepared for concrete pour scheduled for Monday 6-22-2009. I also noticed that the porta-potty had arrived on site. Now the workers will not have to leave to use the restroom.
I need to be certain that the block crew fixes the damage to the stem wall prior to pouring the slab. This is becoming a concern for me. In order to pass an inspection the wall must be fixed and I am sure it will get done, I just want to know when so I don’t lose any sleep over it. Ha Ha.
- Front Porch / Entry Shown
- Front Porch Left Side Shown
- Front Porch from the left side
- Back porch right side
- Back porch left side
- In this photo you can see the damage to the stem wall. This MUST be repaired prior to pouring the concrete slab.
- Back Porch Shown. Size: 11' x 22' Should make for some nice BBQ's


































jenn campogni
Yes, be prepared for the stress to come.