| C |
ROUTE TO PLAN REVIEW |
01/27/2009 |
12/31/2020 |
| C |
LAL NOT COMPLETE |
01/27/2009 |
12/31/2020 |
| C |
LAL RECD ROUTE TO JULIE |
01/29/2009 |
12/31/2020 |
| C |
NR-Landscaping review documents have been forwarded to the downtown office, located at 601 East Kennedy Blvd, for review by Julie Sternfels. Corrections or revisions may be submitted at the original intake office and that office will transmit the documents to Ms. Sternfels on behalf of the applicant. For questions regarding this NR-Landscaping review please contact Julie Sternfels at 813-307-8357 or sternfelsj@hillsboroughcounty.org |
01/30/2009 |
12/31/2020 |
| C |
Graphics review denied .The following information is required before the graphic can be processed. (1 Need site plan to denote FFE and Datum thats being used either NAVD88 or NGVD29. (2 Site plan need to show setbacks from property lines.Site plan that was submitted is not acceptable for review .!/30/09 halln@hillsboroughcounty.org nh. customer contacted by phone. |
01/30/2009 |
12/31/2020 |
| C |
NR-LAL: The Natural Resource LAL-SFD application was submitted to the Netpark office on 01/27 and received by the County Center on 02/02. The application has been determined insufficient for the following reason: Need application sufficiency checklist. Ensure that all items are initialed as either provided or not applicable, and that all applicable information and documents are provided in conformity with the endorsed checklist. No review was made due to insufficient application. Applicant notified by email, and the link to our website with the NR-LAL SFD permit application packet that includes the application sufficiency checklist was provided to the applicant by email (address obtained from building permit information) and was advised to contact Julie Sternfels (813-307-8357), sternfelsj@hillsboroughcounty.org if there are any questions. 02/02/09 |
02/02/2009 |
12/31/2020 |
| C |
CONTRACTOR SUBMITTED CORRECTION TO LAL/RT TO JULIE S. DOWNTOWN OFFICE. |
02/02/2009 |
12/31/2020 |
| C |
NR-Landscaping review documents have been forwarded to the downtown office, located at 601 East Kennedy Blvd, for review by Julie Sternfels. Corrections or revisions may be submitted at the original intake office and that office will transmit the documents to Ms. Sternfels on behalf of the applicant. For questions regarding this NR-Landscaping review please contact Julie Sternfels at 813-307-8357 or sternfelsj@hillsboroughcounty.org |
02/04/2009 |
12/31/2020 |
| C |
NR-LAL: Received application sufficiency checklist on 02/05/09, and it was reviewed with the material received 02/02. The application remains insufficient for the following reasons: (1) It does not appear that the home can be constructed on the subject lot, which is located in zoning district ASC-1. This district requires a 50′ rear and front yard building setback, and 15′ side yard setback, 150′ wide lot, and minimum one acre lot size. The applicant is asked to provide written documentation that our graphics section has approved the home to be built on the subject lot as shown, before the NR-LAL SFD permit can be approved. Meanwhile, we will review the plan as received on 02/02/09. (2) Need plan modified to state the type of home construction (slab on grade, stemwall, stilted, etc) in accordance with the endorsed application sufficiency checklist. (3) Site inspection reveals that the 24″ dbh oak tree’s dripline extends about 38′ from the tree to the north, and that the tree’s limbs grow low. It was found to be in good condition despite trimming for utility wires. Placement of the home as shown would require almost half of the remaining branches to be trimmed about half way back to the tree trunk. This will be considered an impact that will cause the tree to decline, and with the driveway to be constructed so close, the tree should be “X”ed out for removal. 50% replacement will be required (12″ dbh). It appears there is room on the lot to plant the trees, so this will be the required replacement option and will be a permit condition when the application is approved for issuance. Note that this list of concerns includes concerns that would be identified after the application has been determined sufficient, but replying to these will speed review once the application is found to be sufficient. Applicant notified by email and was advised to contact Julie Sternfels (813-307-8357), sternfelsj@hillsboroughcounty.org if there are any questions. 02/05/09 |
02/05/2009 |
12/31/2020 |
| C |
NR-LAL: Met with builder Brian Cirillo and lot owner Chelsea Devito on 04/01/09. They stated the variance is pending, and that they want to trim but not remove the 24″ dbh oak, and that the site’s improvements will not change from what was shown on the previously-received plans. I stated that the tree can be preserved if desired, but we will not give them credit for saving it due to the proposed impacts from trimming and driveway construction. Ms. Devito agreed to plant 12″ dbh of shade trees on the lot, outside of the dripline of preserved trees (on and off the lot), before CO, as replacement. She understands that the 0.21 acre lot will require two lot trees (6′ tall, Florida Grade #1), and that any of the lot trees planted larger than 1″ dbh will be credited towards the 12″ dbh replacement. The comments from 02/05/09 have been modified as follows; the application remains insufficient for the following reasons: (1) It does not appear that the home can be constructed on the subject lot, which is located in zoning district ASC-1. This district requires a 50′ rear and front yard building setback, and 15′ side yard setback, 150′ wide lot, and minimum one acre lot size. The applicant is asked to provide written documentation that our graphics section has approved the home to be built on the subject lot as shown, before the NR-LAL SFD permit can be approved. Meanwhile, we will review the plan as received on 02/02/09. (2) Need plan modified to state the type of home construction (slab on grade, stemwall, stilted, etc) in accordance with the endorsed application sufficiency checklist. (3) Need plan showing the 24″ dbh oak “X”ed out for removal. It does not have to be removed but will not be credited toward lot trees. Applicant and Mr. Cirillo were notified by email and were advised to contact Julie Sternfels (813-307-8357), sternfelsj@hillsboroughcounty.org if there are any questions. 04/01/09 |
04/01/2009 |
12/31/2020 |
| C |
PLAN REVIEW DENIED, 1) NEED PLANS TO SHOW COMPLIANCE WITH THE REQUIREMENTS FOR THE WINDBORNE DEBRIS REGION, NEED INFORMATION ON PAGE 1 OF BLUEPRINTS CHANGED TO SHOW WINDSPEED OVER 120 MPH AND WINDOW PROTECTION SHOWN. 2) NEED FLORIDA PRODUCT APPROVAL TABLE FOR ALL EXTERIOR COMPONENTS AND CLADDING. NOTIFIED CONTR. 4-2-09/CL |
04/02/2009 |
12/31/2020 |
| C |
NR-LAL: Received revised plot plan 05/15/09. The application remains insufficient for the following reasons: (1) The plan provided 05/15/09 is not to scale and does not show the HCHD-approved septic system nor the well and water line. Need revised plot plan. (2) Need documentation the home has been approved by our graphics section to be located as shown on the lot. Applicant and Mr. Cirillo were notified by email and were advised to contact Julie Sternfels (813-307-8357), sternfelsj@hillsboroughcounty.org if there are any questions. 05/15/09 |
05/15/2009 |
12/31/2020 |
| C |
NR-LAL: LAL approved. The Natural Resource LAL-SFD application review has been completed and the permit issued. The Natural Resource permit has been returned to the Netpark office for distribution. On 05/18/09 we received revised plot plans and a copy of variance VAR 09-0430 KO, approved on May 15, 2009, permitting the (two) front yard setbacks to be 25′ and side yard setbacks to be 7.5′ as is shown on the approved plan for the legally non-conforming lot. JBS 05/19/09 |
05/19/2009 |
12/31/2020 |
| N |
LAL, LG, DRW, SDW |
05/20/2009 |
12/31/2020 |
| C |
APP GRAPHIC FWD PLANS EXAMINER 5/20/09 NH |
05/20/2009 |
12/31/2020 |
| C |
NEED SUB-CONTRACTOR FORM |
05/20/2009 |
12/31/2020 |
| C |
HOLDING ON LINDA P. DESK |
05/20/2009 |
12/31/2020 |
| C |
Plan review is completed and approved on 05/20/2009 by Cathy Little. NOTE ! PERMIT IS NOT READY FOR PICKUP. Permit application and plans are being forwarded to a permit clerk for processing. Once the permit clerk has finished the processing, the applicant will be contacted, given the permit fee, and notified that the permit is ready for pickup. |
05/20/2009 |
12/31/2020 |
| N |
WATER APPROVAL |
05/20/2009 |
12/31/2020 |
| N |
WATER FEE PYMT |
05/20/2009 |
12/31/2020 |
| N |
TERMITE INSPECTION CERTIFICATE |
05/20/2009 |
12/31/2020 |
| N |
NEED TECO LAYOUT # |
05/20/2009 |
12/31/2020 |
| N |
SEPTIC APPROVAL # 29-SH-967937 |
05/20/2009 |
12/31/2020 |
| C |
REC’D LAL APPLICAITON |
05/21/2009 |
12/31/2020 |
| C |
FILE IN THE HOLDING CABINET |
05/26/2009 |
12/31/2020 |
| C |
REC’D SUB-CONTRACTOR FORM |
06/03/2009 |
12/31/2020 |
| C |
APPLICATION COMPLETE READY AT CASHIERS |
06/03/2009 |
12/31/2020 |
| C |
REC’D NOC |
06/04/2009 |
12/31/2020 |